Built… 105 Phillip Street shows world leadership in green building practices with its 6-Star Green Star Office v3 As Built Rating, which had the distinction of being the 2000th certified project...
Read More
J.… A key feature of this unique building is the intricate heritage-inspired, street-level brick arches from ground level to Level 9, seamlessly transitioning to a glass and steel tower. Curved steel...
Read More
Built… The construction and refurbishing of the Anzac Memorial Centenary Project was a complex and challenging building project situated on a constrained site with limited access. The original architectural design and...
Read More
J.… A key feature of the finished building is the intricate heritage-inspired, street-level brick arches from ground level to Level 9, using more than 300,000 handmade bricks that seamlessly transition to...
Read More
Patterson… Patterson Building Group was appointed by the Sydney Opera House to construct its redesigned function and events centre – Yallamundi Rooms. The project involved; - -The removal of the external...
Read More
Multiplex… Multiplex, together with its design team, was commissioned as head contractor for the Stage 2 Biological Sciences North Building. Following an intensive workshop process, the option study was submitted to...
Read More
FDC… The client, Arthur Laundy, a publican with more than 60 years’ experience, gave FDC the brief to build a high-end hotel in Marsden Park, the highest growth area in NSW...
Read More
SHAPE… The Flying Fish restaurant project involved the refurbishment of three main areas. The new bar was built in a different location to the previous bar with new beer and post-mix...
Read More
MPA… The refurbished gaming floor contains a new cocktail bar, VIP high rollers’ area, alfresco gaming space, back-of-house staff area, new indoor gaming area and a new six-level lift. The finished...
Read More
SHAPE… The brief was to create a world-class experience when first entering the property. The nature of the live environment involved dividing the works into 22 staged areas (plus micro stages)...
Read More