MPA… The project included innovative reuse of materials, minimisation of waste and the inclusion of indigenous suppliers achieving a top quality project.
Read More
Built… This "outside the box" project displayed a high level of innovation and attention to detailing. This is a truly unique project, delivered with a "can do" attitude.
Read More
Calida… A project within a heritage locomotive shed, in a live environment to provide a café restaurant and Australia's first world class coffee roastery, all delivered to a high quality and...
Read More
The Walsh… High quality workmanship throughout while also achieving a 5 star green star rating. The project was delivered despite base building delays and access issues together with the need to maintain...
Read More
SHAPE… An exceptionally high quality project delivered within a tight project program. Requirements for high acoustic ratings, extensive audio visual and building services provisions throughout combined with top level finishes resulting...
Read More
Buildcorp… This project was delivered within the existing heritage building. A state of the art office environment was achieved while still allowing the existing building features to remain. The result is...
Read More
Belmadar… The project showcases outstanding construction delivery in a live, operational school environment. Belmadar overcame complex site conditions, mid-project design changes and environmental constraints to deliver a high-quality, future-focused learning facility...
Read More
Taylor… The student centre stands as a beacon of design excellence, collaboration, and dedication to both modern education and historical preservation. It is a vibrant and accessible learning environment that will...
Read More
Patterson… The schools design and construct Stage 2 project includes the engagement of consultants and the construction of two 3-storey buildings consisting of 20 learning spaces, associated external works including hard...
Read More
A W… The project involved the complete demolition of the existing facility and the rebuilding of a new school over three stages. There were significant challenges to the build due to its...
Read More