AS4901
AS4901 (1998)
Subcontract Conditions. This Standard was prepared by the joint Standards Australia/Standards New Zealand Committee OB/3, General...
$88.00
Non-members $104.50
Variations
AS 1684.3-2010
AS 1684.3-2010 - Residential timber-framed construction, Part 3: Cyclonic areas
Provides the building industry with procedures that can be used to determine building practice, to design...
$170.50
Non-members $192.50
Variations
Australian Standard Method of Measurement of Building Works
Australian Standard Method of Measurement of Building Works
The purpose of the Standard Method of Measurement is to provide a uniform basis for the...
$93.50
Non-members $104.50
Variations
Decon 2013
DECON 2013 Lump Sum Contract
DECON 2013 is a Design and Construct contract which is used when the contractor provides all...
$77.00
Non-members $99.00
Variations
Preliminary Works
Contract for Preliminary Works (Pad of 5)
The contract for preliminary works is suitable for a pre-construction scope of works. The type of...
$30.80
Non-members $44.00
Variations
Safety helmets must be worn
This is a hard hat area - safety helmets must be worn
Please note this item cannot be posted - PICK UP ONLY from your local Master Builders...
$18.00
Non-members $27.00
Variations