Icon… This project involved major alterations and additions to the existing Clare Hotel and administration building. Construction included demolition, excavation, services and high-quality fitout to 62 rooms, offices, back-of-house areas, common...
Read More
Bennett… The Elements of Byron is a new five-star resort located on Belongil Beach, Byron Bay. The resort includes restaurants, bars, extensive function facilities, pools and landscaping. The lobby and reception...
Read More
… This project is the redevelopment of the former Swiss Grand Resort Spa in Bondi. The Pacific is a mixed-use development now with 112 luxury residential apartments, a boutique hotel with...
Read More
Multiplex… Stage 1 of the 161 Sussex Street Redevelopment Project involved the refurbishment of the existing operational hotel, the connection to adjacent heritage buildings and the construction of a new 3450sqm...
Read More
Built… The newly constructed 18-storey office building on a complex CBD site, located on top of a rail corridor, is flanked on three sides by existing multi-storey structures including the Hilton...
Read More
Total… This project took place within an existing facility operating 24/7, with continual truck and pedestrian movements taking place around the work site and where dust control was critical. The works...
Read More
Vaughan… Vaughan Constructions demolished an existing 3200sqm, 24m-high warehouse and replaced it with a 5000sqm, 32m automated highbay warehouse. The site remained fully operational for pre-mix and liquor bottling, and the...
Read More
Qanstruct… This project was constructed on a greenfield site and comprised 20,000sqm of temperature- and humidity-controlled warehouse, 4500sqm of temperature- and humidity-controlled manufacturing and packaging areas and a 3500sqm office area...
Read More
MPA… The new stair in the University of Sydney Business School required the procurement and fixing of 2mm-thick silky oak timber veneer cladding to the faces and soffit of a spiral...
Read More
Ichor… The Quantum Computation and Communication Technology Centre is a highly technical laboratory fit out. It has highly specialised equipment that requires tightly controlled conditions to operate effectively. The equipment is...
Read More